* 
					Class A 
					
					arc fault protection 
					(protection of 
					people) 
					5
				
				
					* 
					Class B
					 
					arc fault protection 
					(protection of 
					persons and 
					assemblies) 
					5
				
				
					* 
					Class C
					
					arc fault protection 
					(protection of 
					persons and 
					assemblies) 
					5
				
				
					No special 
					requirement for 
					arc fault protection
				
				
				
					Redundant switchgear* assembly 
					recommended. 
					
					
					New and separate assessment of the 
					protection goals for the protection of 
					people and systems! 
					
					Additional equipment of an active arc 
					fault system recommended
				
				
					*
					 Class C AND active arc 
					fault protection
					 
					integrated and tested 
					as per 
					IEC 61439-2:2021
					With user/manufacturer 
					agreement for testing 
					with open door or cover.
				
				
					In addition: 
					Suitable PPE against 
					the thermal effects of 
					arc faults IEC 61482-2 
					APC 1 or APC 2/
					PPE1, 2, 3 or 4
				
				
					* 
					Class C AND active arc 
					fault protection
					integrated and tested 
					as per 
					IEC 61439-2:2021
					Doors and covers 
					properly closed
				
				
				
					DEHNshort
				
				
				
					DEHNcare
				
				
				
					DEHNshort
				
				
				
					* 
					Class C AND active arc fault protection
					integrated and tested as per IEC TS 63107
					Doors and covers properly closed. 
					The active arc fault protection should be certified to 
					VdS 2344
					 (fire protection technology systems) and 
					2349
					 (reliable electrical installation) in order to be 
					accepted by property insurers.
				
				
				
					DEHNshort
				
			
			
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
			
			
				
				
					No measures 
					necessary
				
				
				
					Technical 
					measures 
					necessary 
					(standard 
					requirements)
				
				
				
					Technical 
					measures 
					necessary
					
					(strict 
					requirements)
				
				
				
					Technical 
					measures 
					necessary 
					(very strict 
					requirements)
				
			
			
				
				
				
					for DEHNarX analysis
				
				
					Assessment of hazards and risks
				
				
					e.g. as per DGUV-I 203-077 or IEEE 1584 (2018) & NFPA 70E (2021)
				
			
			
				
					
					
						Shutdown always possible
					
				
				
					
					
						Shutdown not possible
					
				
				
					
					
						Distance
					
				
				
					
					
						On the switchgear installation
					
				
				
					
					
						2–4 hours
					
				
				
					
					
						7–10 days
					
				
				
					
					
						2–4 weeks
					
				
				
					
					
						1–2 months
					
				
				
					
					
						Seconds/minutes, not tolerable
					
				
			
			
				
				
					Personal protection
				
				
					Personal protection
				
				
					Assembly protection
				
				
					Assembly protection
				
				
				
				
					
					
						Maintenance
						3
					
					
						Assembly open
					
				
				
					
					
						Operation
						2
					
					
						Assembly closed
					
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
				
					
					
						Fire protection
					
					
						Fire risk reduction
						5
					
				
				
			
			
		
		
			
					
						
						
							Maintenance
							3
						
						
							Assembly open
						
					
				
					
						
						
							Shutdown always possible
						
					
				
				
					
						
						
							Shutdown not possible
						
					
				
					
						
						
							Operation
							2
						
						
							Assembly closed
						
					
				
					
						
						
							Distance
						
					
				
				
					
						
						
							On the switchgear installation
						
					
				
					
						
						
							Availability
							 
							4
						
						
							Tolerable downtime
						
					
				
					
						
						
							Seconds/minutes, not tolerable
						
					
				
				
					
						
						
							2–4 hours
						
					
				
				
					
						
						
							7–10 days
						
					
				
				
					
						
						
							2–4 weeks
						
					
				
				
					
						
						
							1–2 months
						
					
				
				
					
						
						
							Fire protection
						
						
							Fire risk reduction 
							5
						
					
				
			
		
		
			
				
				
				
				
				
				
				
					No measures 
					necessary
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
			
			
				
				
					Operation
					2
				
				
					Assembly closed
				
			
			
			
				Distance
			
			
			
			
				Switchgear assembly as per IEC 61439-2:2021
			
		
		
			
				
				
					Operation
					2
				
				
					Assembly closed
				
			
			
				
				
				
			
				
					
						
						
							No measures 
							necessary
						
					
				
				
					
						
						
							Technical 
							measures 
							necessary
							(standard 
							requirements)
						
					
				
				
					
						
						
							Technical 
							measures 
							necessary
							
							(strict 
							requirements)
						
					
				
				
				
					
						
						
							for DEHNarX analysis
						
					
				
				
					Assessment of hazards and risks
				
				
					e.g. as per DGUV-I 203-077 or IEEE 1584 (2018) & NFPA 70E (2021)
				
				
					
					
						Operation
						2
					
					
						Assembly closed
					
				
				
				
					On the switchgear installation
				
			
		
		
			
				
				
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
				
					
					
						No measures 
						necessary
					
				
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
			
		
		
			
				
				
				
				
				
				
				
					* 
					Class A 
					
					arc fault protection 
					(protection of 
					people) 
					5
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
				
					
					
						Technical 
						measures 
						necessary 
						(standard 
						requirements)
					
				
			
		
		
			
			
			
			
			
				Switchgear assembly as per IEC 61439-2:2021
			
			
			
				Proof of inspection as per IEC TR 61641:2014 in arc faults*
			
			
				
				
					Technical 
					measures 
					necessary
					
					(strict 
					requirements)
				
			
			
			
			
			
				* 
				Class C AND active arc 
				fault protection
				integrated and tested 
				as per 
				IEC 61439-2:2021
				Doors and covers 
				properly closed
			
			
				
					
					
						DEHNshort
					
				
			
		
		
			
				
				
				
					Maintenance
					3
				
				
					Assembly open
				
				
					
					
						Shutdown always possible
					
				
				
				
				
				
				
				
					No measures 
					necessary
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
			
		
		
		
			
				
				
					Maintenance
					3
				
				
					Assembly open
				
				
					
					
						Shutdown not possible
					
				
				
				
				
				
				
				
				
				
				
				
					Technical 
					measures 
					necessary
					(very strict 
					requirements)
				
				
					*
					 Class C AND active arc 
					fault protection
					 
					integrated and tested 
					as per 
					IEC 61439-2:2021
					With user/manufacturer 
					agreement for testing 
					with open door or cover.
				
				
					In addition: 
					Suitable PPE against 
					the thermal effects of 
					arc faults IEC 61482-2 
					APC 1 or APC 2/
					PPE1, 2, 3 or 4
				
				
				
					
						
						
							for DEHNarX analysis
						
					
				
				
					Assessment of hazards and risks
				
				
					e.g. as per DGUV-I 203-077 or IEEE 1584 (2018) & NFPA 70E (2021)
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
					
						
						
							DEHNshort
						
					
				
				
					
						
						
							PSAgS
						
					
				
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
			
		
		
			
				
				
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
					
					
						1–2 months
					
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
			
				
				
				
				
				
				
					* 
					Class B
					 
					arc fault protection 
					(protection of 
					persons and 
					assemblies) 
					5
				
				
					
					
						2–4 weeks
					
				
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
			
				
				
				
				
				
				
					* 
					Class C
					
					arc fault protection 
					(protection of 
					persons and 
					assemblies) 
					5
				
				
					
					
						7–10 days
					
				
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
		
			
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
				
				
				
				
					* 
					Class C AND active arc 
					fault protection
					integrated and tested 
					as per 
					IEC 61439-2:2021
					Doors and covers 
					properly closed
				
				
					
						
						
							DEHNshort
						
					
				
				
					
					
						2–4 hours
					
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
		
			
				
				
				
				
				
					Redundant switchgear* assembly 
					recommended. 
					
					
					New and separate assessment of the 
					protection goals for the protection of 
					people and systems! 
					
					Additional equipment of an active arc 
					fault system recommended
				
				
					
					
						Seconds/minutes, not tolerable
					
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
			
				
				
				
					Fire protection
				
				
					Fire risk reduction
					5
				
				
				
				
					
					
						* 
						Class C AND active arc fault protection
						integrated and tested as per IEC TS 63107
						Doors and covers properly closed. 
						The active arc fault protection should be certified to 
						VdS 2344
						 (fire protection technology systems) and 
						2349
						 (reliable electrical installation) in order to be 
						accepted by property insurers.
					
				
				
				
				
					Switchgear assembly as per IEC 61439-2:2021
				
				
					
					
						DEHNshort
					
				
				
					Proof of inspection as per IEC TR 61641:2014 in arc faults*