					Class A 
					
					arc fault protection 
					(protection of 
					people) 
					5
				
				
					* 
					Class B
					 
					arc fault protection 
					(protection of 
					people and 
					systems) 
					5
				
				
					* 
					Class C
					
					arc fault protection 
					(protection of 
					people and 
					systems) 
					5
				
				
					No special 
					requirement for 
					arc fault protection
				
				
				
					Redundant switchgear* assembly 
					recommended. 
					
					
					New and separate assessment of the 
					protection goals for the protection of 
					people and systems! 
					
					Additional equipment of an active arc 
					fault system recommended
				
				
					*
					 Class C AND active arc 
					fault protection
					 
					integrated and tested 
					as per DIN VDE 
					0660-600-2-1 
					With user/manufacturer 
					agreement for testing 
					with open door or cover.
				
				
					In addition: 
					Suitable PPE against 
					the thermal effects of 
					arc faults IEC 61482-2 
					APC 1 or APC 2
				
				
					* 
					Class C AND active arc 
					fault protection
					integrated and tested 
					as per DIN VDE 
					0660-600-2-1
					Doors and covers 
					properly closed
				
				
				
					DEHNshort
				
				
				
					DEHNcare
				
				
				
					DEHNshort
				
				
				
					* 
					Class C AND active arc fault protection
					integrated and tested as per DIN VDE 0660-600-2-1
					Doors and covers properly closed. 
					The active arc fault protection should be certified to 
					VdS 2344
					 (fire protection technology systems) and 
					2349
					 (reliable electrical installation) in order to be 
					accepted by property insurers.
				
				
				
					DEHNshort
				
			
			
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
			
			
				
				
					No measures 
					necessary
				
				
				
					Technical 
					measures 
					necessary 
					(standard 
					requirements)
				
				
				
					Technical 
					measures 
					necessary
					
					(strict 
					requirements)
				
				
				
					Technical 
					measures 
					necessary 
					(strict 
					requirements)
				
			
			
				
				
				
					for DEHNarX analysis
				
				
					Assessment of hazards and risks
				
				
					e.g. as per DGUV-I 203-077
				
			
			
				
					
					
						Shutdown always possible
					
				
				
					
					
						Shutdown not possible
					
				
				
					
					
						Distance
					
				
				
					
					
						On the switchgear installation
					
				
				
					
					
						2–4 hours
					
				
				
					
					
						7–10 days
					
				
				
					
					
						2–4 weeks
					
				
				
					
					
						1–2 months
					
				
				
					
					
						Seconds/minutes, not tolerable
					
				
			
			
				
				
					Protection of people
				
				
					Protection of people
				
				
					System protection
				
				
					System protection
				
				
				
				
					
					
						Maintenance
						3
					
					
						Switchgear installation open
					
				
				
					
					
						Operation
						2
					
					
						Switchgear installation closed
					
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
				
					
					
						Fire protection
					
					
						Fire risk reduction
						5
					
				
				
			
			
		
		
			
					
						
						
							Maintenance
							3
						
						
							Switchgear installation open
						
					
				
					
						
						
							Shutdown always possible
						
					
				
				
					
						
						
							Shutdown not possible
						
					
				
					
						
						
							Operation
							2
						
						
							Switchgear installation closed
						
					
				
					
						
						
							Distance
						
					
				
				
					
						
						
							On the switchgear installation
						
					
				
					
						
						
							Availability
							 
							4
						
						
							Tolerable downtime
						
					
				
					
						
						
							Seconds/minutes, not tolerable
						
					
				
				
					
						
						
							2–4 hours
						
					
				
				
					
						
						
							7–10 days
						
					
				
				
					
						
						
							2–4 weeks
						
					
				
				
					
						
						
							1–2 months
						
					
				
				
					
						
						
							Fire protection
						
						
							Fire risk reduction
							5
						
					
				
			
		
		
			
				
				
				
				
				
				
				
					No measures 
					necessary
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
			
			
				
				
					Operation
					2
				
				
					Switchgear installation closed
				
			
			
			
				Distance
			
			
			
			
				Switchgear assembly as per DIN EN 61436-2
			
		
		
			
				
				
					Operation
					2
				
				
					Switchgear installation closed
				
			
			
				
				
				
			
				
					
						
						
							No measures 
							necessary
						
					
				
				
					
						
						
							Technical 
							measures 
							necessary
							(standard 
							requirements)
						
					
				
				
					
						
						
							Technical 
							measures 
							necessary
							
							(strict 
							requirements)
						
					
				
				
				
					
						
						
							for DEHNarX analysis
						
					
				
				
					Assessment of hazards and risks
				
				
					e.g. as per DGUV-I 203-077
				
				
					
					
						Operation
						2
					
					
						Switchgear installation closed
					
				
				
				
					On the switchgear installation
				
			
		
		
			
				
				
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
				
					
					
						No measures 
						necessary
					
				
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
			
		
		
			
				
				
				
				
				
				
				
					* 
					Class A 
					
					arc fault protection 
					(protection of 
					people) 
					5
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
				
					
					
						Technical 
						measures 
						necessary 
						(standard 
						requirements)
					
				
			
		
		
			
			
			
			
			
				Switchgear assembly as per DIN EN 61436-2
			
			
			
				Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
			
			
				
				
					Technical 
					measures 
					necessary
					
					(strict 
					requirements)
				
			
			
			
			
			
				* 
				Class C AND active arc 
				fault protection
				integrated and tested 
				as per DIN VDE 
				0660-600-2-1
				Doors and covers 
				properly closed
			
			
				
					
					
						DEHNshort
					
				
			
		
		
			
				
				
				
					Maintenance
					3
				
				
					Switchgear installation open
				
				
					
					
						Shutdown always possible
					
				
				
				
				
				
				
				
					No measures 
					necessary
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
			
		
		
		
			
				
				
					Maintenance
					3
				
				
					Switchgear installation open
				
				
					
					
						Shutdown not possible
					
				
				
				
				
				
				
				
				
				
				
				
					Technical 
					measures 
					necessary
					(strictest 
					requirements)
				
				
					*
					 Class C AND active arc 
					fault protection
					 
					integrated and tested 
					as per DIN VDE 
					0660-600-2-1 
					With user/manufacturer 
					agreement for testing 
					with open door or cover.
				
				
					In addition: 
					Suitable PPE against 
					the thermal effects of 
					arc faults IEC 61482-2 
					APC 1 or APC 2
				
				
				
					
						
						
							for DEHNarX analysis
						
					
				
				
					Assessment of hazards and risks
				
				
					e.g. as per DGUV-I 203-077
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
					
						
						
							DEHNshort
						
					
				
				
					
						
						
							PSAgS
						
					
				
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
			
		
		
			
				
				
				
				
				
					No special 
					requirement for 
					arc fault protection
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
					
					
						1–2 months
					
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
			
				
				
				
				
				
				
					* 
					Class B
					 
					arc fault protection 
					(protection of 
					people and 
					systems) 
					5
				
				
					
					
						2–4 weeks
					
				
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
			
				
				
				
				
				
				
					* 
					Class C
					
					arc fault protection 
					(protection of 
					people and 
					systems) 
					5
				
				
					
					
						7–10 days
					
				
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
		
			
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
				
				
				
				
					* 
					Class C AND active arc 
					fault protection
					integrated and tested 
					as per DIN VDE 
					0660-600-2-1
					Doors and covers 
					properly closed
				
				
					
						
						
							DEHNshort
						
					
				
				
					
					
						2–4 hours
					
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
		
		
			
				
				
				
				
				
					Redundant switchgear* assembly 
					recommended. 
					
					
					New and separate assessment of the 
					protection goals for the protection of 
					people and systems! 
					
					Additional equipment of an active arc 
					fault system recommended
				
				
					
					
						Seconds/minutes, not tolerable
					
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
					
					
						Availability
						 
						4
					
					
						Tolerable downtime
					
				
			
		
			
				
				
				
					Fire protection
				
				
					Fire risk reduction
					5
				
				
				
				
					
					
						* 
						Class C AND active arc fault protection
						integrated and tested as per DIN VDE 0660-600-2-1
						Doors and covers properly closed. 
						The active arc fault protection should be certified to 
						VdS 2344
						 (fire protection technology systems) and 
						2349
						 (reliable electrical installation) in order to be 
						accepted by property insurers.
					
				
				
				
				
					Switchgear assembly as per DIN EN 61436-2
				
				
					
					
						DEHNshort
					
				
				
					Proof of inspection as per DIN EN 61439-2 supplement 1 in arc faults*